Jump to content

QESTNET Internal:QESTField Pre-Build Checklist: Difference between revisions

From QESTonline
John.meegan (talk | contribs)
No edit summary
 
John.meegan (talk | contribs)
No edit summary
 
(23 intermediate revisions by the same user not shown)
Line 1: Line 1:
= Workflows =
<noinclude>
[[QESTNET_Internal:Developer_Home|Developer Home]]
----
</noinclude>


1. Provide a list of the workflows required for the customer from the following list:
= QESTField Pre-Build Checklist =
 
This wiki page is for internal use, for customer managers to use in preparation for doing builds for new customers. Please ensure as best as possible each of these items has been addressed prior to the dev team being asked to do a build.
 
== Workflows ==
 
Provide a list of the workflows required for the customer from the following list: [[QESTNET_Internal:QESTField List of Workflows|List of Workflows]]
 
 
== External Documents and Reports ==
 
Ensure all required external documents are installed in the database to be built against. This includes the the following in-house US Workflows Reports:


{|class="wikitable"
{|class="wikitable"


|- valign="top"
|- valign="top"
!Search Filters
!QestID
!UUID
!Name
!Comments
 
|- valign="top"
|- valign="top"
|style="background:white;"|Work Orders (with Field Technician)
|style="background:white;"|19900
|style="background:white;"|276bac80-d7d0-471f-b3f5-31164c2aa403
|style="background:white;"|Daily Field Report
|style="background:white;"|


|- valign="top"
|style="background:white;"|19901
|style="background:white;"|Report for Mechanical Testing of Steel Products [ASTM A 370]


|- valign="top"
|- valign="top"
!Samples
|style="background:white;"|19902
!UUID
|style="background:white;"|Report for Mechanical Testing of Steel Products [Caltrans CT670 Splice]
!Comments
 
|- valign="top"
|- valign="top"
|style="background:white;"|View Work Order
|style="background:white;"|19903
|style="background:white;"|AD1B8802-4125-400D-B649-A0A7C281AE9A
|style="background:white;"|Report for Mechanical Testing of Steel Products [Caltrans CT670 Hoops]
|style="background:white;"|


|- valign="top"
|style="background:white;"|19904
|style="background:white;"|Report for Batch Plant Inspection Checklist


|}
|}
<noinclude>
[[QESTNET_Internal:Developer_Home|Developer Home]]
----
</noinclude>

Latest revision as of 04:54, 4 April 2016

Developer Home



QESTField Pre-Build Checklist

This wiki page is for internal use, for customer managers to use in preparation for doing builds for new customers. Please ensure as best as possible each of these items has been addressed prior to the dev team being asked to do a build.

Workflows

Provide a list of the workflows required for the customer from the following list: List of Workflows


External Documents and Reports

Ensure all required external documents are installed in the database to be built against. This includes the the following in-house US Workflows Reports:

QestID Name
19900 Daily Field Report
19901 Report for Mechanical Testing of Steel Products [ASTM A 370]
19902 Report for Mechanical Testing of Steel Products [Caltrans CT670 Splice]
19903 Report for Mechanical Testing of Steel Products [Caltrans CT670 Hoops]
19904 Report for Batch Plant Inspection Checklist


Developer Home