Jump to content

QESTNET Internal:QESTField Pre-Build Checklist: Difference between revisions

From QESTonline
John.meegan (talk | contribs)
No edit summary
John.meegan (talk | contribs)
No edit summary
 
(14 intermediate revisions by the same user not shown)
Line 1: Line 1:
= Workflows =
<noinclude>
[[QESTNET_Internal:Developer_Home|Developer Home]]
----
</noinclude>


Provide a list of the workflows required for the customer from the following list:
= QESTField Pre-Build Checklist =


== Search Filters ==
This wiki page is for internal use, for customer managers to use in preparation for doing builds for new customers. Please ensure as best as possible each of these items has been addressed prior to the dev team being asked to do a build.


{|class="wikitable"
== Workflows ==
 
|- valign="top"
!Name
!UUID
!Comments
 
|- valign="top"
|style="background:white;"|Work Orders
|style="background:white;"|8f47070f-4892-4e25-b492-d7e4898e26c0
|style="background:white;"|The standard Work Order filter.


|- valign="top"
Provide a list of the workflows required for the customer from the following list: [[QESTNET_Internal:QESTField List of Workflows|List of Workflows]]
|style="background:white;"|Work Orders (with Field Technician)
|style="background:white;"|276bac80-d7d0-471f-b3f5-31164c2aa403
|style="background:white;"|


|}


== External Documents and Reports ==


== Work Order ==
Ensure all required external documents are installed in the database to be built against. This includes the the following in-house US Workflows Reports:


{|class="wikitable"
{|class="wikitable"


|- valign="top"
|- valign="top"
!QestID
!Name
!Name
!Buttons
!UUID
!Comments


|- valign="top"
|- valign="top"
|style="background:white;"|Add Work Order
|style="background:white;"|19900
|style="background:white;"|{Lab Code} ({Lab Name})
|style="background:white;"|Daily Field Report
|style="background:white;"|B9D04540-8B2F-478E-A0F8-8596787E5136
|style="background:white;"|Appears only on the search filter page


|- valign="top"
|- valign="top"
|style="background:white;"|View Work Order
|style="background:white;"|19901
|style="background:white;"|Work Order: {Sample ID}
|style="background:white;"|Report for Mechanical Testing of Steel Products [ASTM A 370]
|style="background:white;"|AD1B8802-4125-400D-B649-A0A7C281AE9A
|style="background:white;"|


|- valign="top"
|- valign="top"
|style="background:white;"|Edit Work Order
|style="background:white;"|19902
|style="background:white;"|Edit Work Order
|style="background:white;"|Report for Mechanical Testing of Steel Products [Caltrans CT670 Splice]
|style="background:white;"|52055C3C-8369-481C-95B3-0101B52CF0F6
|style="background:white;"|


|- valign="top"
|- valign="top"
|style="background:white;"|Finalize Work Order
|style="background:white;"|19903
|style="background:white;"|Finalize Work Order
|style="background:white;"|Report for Mechanical Testing of Steel Products [Caltrans CT670 Hoops]
|style="background:white;"|d97373a9-7eea-4a9c-be19-7ffa154d3459
|style="background:white;"|


|- valign="top"
|- valign="top"
|style="background:white;"|Manage Test Report Images
|style="background:white;"|19904
|style="background:white;"|Manage Test Report Images
|style="background:white;"|Report for Batch Plant Inspection Checklist
|style="background:white;"|c0b5da5c-274e-49ff-8c65-0c44399ea39a
|style="background:white;"|
 
|- valign="top"
|style="background:white;"|Add Test Report Image
|style="background:white;"|Add Test Report Image
|style="background:white;"|a813fa36-802f-435d-a386-bcfedb70a778
|style="background:white;"|
 
|- valign="top"
|style="background:white;"|Edit Test Report Image
|style="background:white;"|Edit Test Report Image
|style="background:white;"|630a429f-2f8e-4ab1-8821-1eb1971680c3
|style="background:white;"|


|}
|}




== Concrete Sample [AS] ==
<noinclude>
 
[[QESTNET_Internal:Developer_Home|Developer Home]]
{|class="wikitable"
----
 
</noinclude>
|- valign="top"
!Name
!Buttons
!UUID
!Comments
 
|- valign="top"
|style="background:white;"|New Concrete Work Order [AS]
|style="background:white;"|New Concrete Work Order ({Laboratory Name})
|style="background:white;"|094dcdcc-9f2d-498c-bfce-945f101f677f
|style="background:white;"|Appears only on the search filter page
 
|- valign="top"
|style="background:white;"|New Concrete Sample [AS]
|style="background:white;"|{0}: Edit Concrete Field Testing
New Concrete Field Testing
|style="background:white;"|5a4a12b5-8605-4f67-99d3-a3340721ae4d
|style="background:white;"|
 
|- valign="top"
|style="background:white;"|Start Curing [AS]
|style="background:white;"|{0}: Start Curing {1}
|style="background:white;"|c3d44836-5003-4076-9ed3-1a7649612986
|style="background:white;"|
 
|- valign="top"
|style="background:white;"|Email Work Order Summary [AS]
|style="background:white;"|Email Work Order Summary
|style="background:white;"|cea85468-e2ce-4b0f-83c4-7956a5fbced9
|style="background:white;"|Sends an email summarising data from all completed Concrete Samples [AS].
 
|}
 
 
== Concrete Sample [ASTM] ==
 
{|class="wikitable"
 
|- valign="top"
!Name
!Buttons
!UUID
!Comments
 
|- valign="top"
|style="background:white;"|View Concrete Sample [ASTM]
|style="background:white;"|Concrete Sample: {0}
|style="background:white;"|29eaae52-f68f-4cc4-aa14-880fdd11c26b
|style="background:white;"|Display-element based. Read-only. Used for a summary header when clicking on the sample button.
 
|- valign="top"
|style="background:white;"|New Concrete Testing [ASTM] - Field/Specimens
|style="background:white;"|New Concrete Testing - Field/Specimens
|style="background:white;"|5e9c4773-3df7-4e97-8e03-653c0a8d4899
|style="background:white;"|AKA No-Batch
 
|- valign="top"
|style="background:white;"|New Concrete Testing [ASTM] - Field/Batch/Specimens
|style="background:white;"|New Concrete Testing - Field/Batch/Specimens
{0}: Edit Concrete Testing
|style="background:white;"|fd65406c-0980-4eba-a5ac-2b09be678248
|style="background:white;"|
 
|}
 
 
== Samples ==
 
{|class="wikitable"
 
|- valign="top"
!Name
!Buttons
!UUID
!Comments
 
|- valign="top"
|style="background:white;"|Agg/Soil Sample Pickup
|style="background:white;"|New Agg/Soil Sample Pickup
{0}: Edit Agg/Soil Sample Pickup
|style="background:white;"|F9F30F16-366A-4262-94EF-CA4A3CA49903
|style="background:white;"|
 
|- valign="top"
|style="background:white;"|Asphalt Sample Pickup
|style="background:white;"|New Asphalt Sample Pickup
{0}: Edit Asphalt Sample Pickup
|style="background:white;"|0EF4E369-0F6F-4BFB-825D-9F40C667371D
|style="background:white;"|
 
|- valign="top"
|style="background:white;"|Other Sample Pickup
|style="background:white;"|New Other Sample Pickup
{0}: Edit Other Sample Pickup
|style="background:white;"|2AD86A6A-8636-4B76-9876-93778B070241
|style="background:white;"|
 
|}
 
== Agg/Soil Testing ==
 
{|class="wikitable"
 
|- valign="top"
!Name
!Buttons
!UUID
!Comments
 
|- valign="top"
|style="background:white;"|Nuclear Density [ASTM D 6938]
|style="background:white;"|New Nuclear Density [ASTM D 6938]
{0}: Edit Nuclear Density [ASTM D 6938]
|style="background:white;"|6827e960-26f6-44c9-932f-daae658a5898
|style="background:white;"|
 
|- valign="top"
|style="background:white;"|In-situ Density - Sand Cone Method [ASTM D 1556]
|style="background:white;"|New In-situ Density - Sand Cone Method [ASTM D 1556]
{0}: Edit In-situ Density - Sand Cone Method [ASTM D 1556]
|style="background:white;"|9940819e-677e-4620-a487-81848b72b522
|style="background:white;"|
 
|- valign="top"
|style="background:white;"|Asphalt Density [ASTM D 2950]
|style="background:white;"|New Asphalt Density [ASTM D 2950]
{0}: Edit Asphalt Density [ASTM D 2950]
|style="background:white;"|79883742-b220-486a-973f-593b49905ae3
|style="background:white;"|
 
|- valign="top"
|style="background:white;"|
|style="background:white;"|
|style="background:white;"|
|style="background:white;"|
 
|}

Latest revision as of 04:54, 4 April 2016

Developer Home



QESTField Pre-Build Checklist

This wiki page is for internal use, for customer managers to use in preparation for doing builds for new customers. Please ensure as best as possible each of these items has been addressed prior to the dev team being asked to do a build.

Workflows

Provide a list of the workflows required for the customer from the following list: List of Workflows


External Documents and Reports

Ensure all required external documents are installed in the database to be built against. This includes the the following in-house US Workflows Reports:

QestID Name
19900 Daily Field Report
19901 Report for Mechanical Testing of Steel Products [ASTM A 370]
19902 Report for Mechanical Testing of Steel Products [Caltrans CT670 Splice]
19903 Report for Mechanical Testing of Steel Products [Caltrans CT670 Hoops]
19904 Report for Batch Plant Inspection Checklist


Developer Home