= Workflows =
<noinclude>
[[QESTNET_Internal:Developer_Home|Developer Home]]
----
</noinclude>


Provide a list of the workflows required for the customer from the following list:
= QESTField Pre-Build Checklist =


== Search Filters ==
This wiki page is for internal use, for customer managers to use in preparation for doing builds for new customers. Please ensure as best as possible each of these items has been addressed prior to the dev team being asked to do a build.


{|class="wikitable"
== Workflows ==


|- valign="top"
Provide a list of the workflows required for the customer from the following list: [[QESTNET_Internal:QESTField List of Workflows|List of Workflows]]
!Name
!UUID
!Comments


|- valign="top"
|style="background:white;"|Work Orders (with Field Technician)
|style="background:white;"|276bac80-d7d0-471f-b3f5-31164c2aa403
|style="background:white;"|


|}
== External Documents and Reports ==


 
Ensure all required external documents are installed in the database to be built against. This includes the the following in-house US Workflows Reports:
== Work Order ==


{|class="wikitable"
{|class="wikitable"


|- valign="top"
|- valign="top"
!QestID
!Name
!Name
!Buttons
!UUID
!Comments


|- valign="top"
|- valign="top"
|style="background:white;"|View Work Order
|style="background:white;"|19900
|style="background:white;"|Work Order: {Sample ID}
|style="background:white;"|Daily Field Report
|style="background:white;"|AD1B8802-4125-400D-B649-A0A7C281AE9A
|style="background:white;"|In code, not display-element based.


|- valign="top"
|- valign="top"
|style="background:white;"|Edit Work Order
|style="background:white;"|19901
|style="background:white;"|Edit Work Order
|style="background:white;"|Report for Mechanical Testing of Steel Products [ASTM A 370]
|style="background:white;"|52055C3C-8369-481C-95B3-0101B52CF0F6
|style="background:white;"|In code, not display-element based.
 
|}
 
 
== Concrete Sample ==
 
{|class="wikitable"


|- valign="top"
|- valign="top"
!Name
|style="background:white;"|19902
!Buttons
|style="background:white;"|Report for Mechanical Testing of Steel Products [Caltrans CT670 Splice]
!UUID
!Comments


|- valign="top"
|- valign="top"
|style="background:white;"|New Concrete Work Order [AS]
|style="background:white;"|19903
|style="background:white;"|New Concrete Work Order ({Laboratory Name})
|style="background:white;"|Report for Mechanical Testing of Steel Products [Caltrans CT670 Hoops]
|style="background:white;"|094dcdcc-9f2d-498c-bfce-945f101f677f
|style="background:white;"|Appears only on the search filter page


|- valign="top"
|- valign="top"
|style="background:white;"|New Concrete Sample [AS]
|style="background:white;"|19904
|style="background:white;"|{0}: Edit Concrete Field Testing
|style="background:white;"|Report for Batch Plant Inspection Checklist
New Concrete Field Testing
|style="background:white;"|5a4a12b5-8605-4f67-99d3-a3340721ae4d
|style="background:white;"|


|- valign="top"
|}
|style="background:white;"|Start Curing [AS]
|style="background:white;"|{0}: Start Curing {1}
|style="background:white;"|c3d44836-5003-4076-9ed3-1a7649612986
|style="background:white;"|


|- valign="top"
|style="background:white;"|Email Work Order Summary [AS]
|style="background:white;"|Email Work Order Summary
|style="background:white;"|cea85468-e2ce-4b0f-83c4-7956a5fbced9
|style="background:white;"|Sends an email summarising data from all completed Concrete Samples [AS].


|}
<noinclude>
[[QESTNET_Internal:Developer_Home|Developer Home]]
----
</noinclude>

Latest revision as of 04:54, 4 April 2016

Developer Home



QESTField Pre-Build Checklist

This wiki page is for internal use, for customer managers to use in preparation for doing builds for new customers. Please ensure as best as possible each of these items has been addressed prior to the dev team being asked to do a build.

Workflows

Provide a list of the workflows required for the customer from the following list: List of Workflows


External Documents and Reports

Ensure all required external documents are installed in the database to be built against. This includes the the following in-house US Workflows Reports:

QestID Name
19900 Daily Field Report
19901 Report for Mechanical Testing of Steel Products [ASTM A 370]
19902 Report for Mechanical Testing of Steel Products [Caltrans CT670 Splice]
19903 Report for Mechanical Testing of Steel Products [Caltrans CT670 Hoops]
19904 Report for Batch Plant Inspection Checklist


Developer Home