This wiki page is for internal use, for customer managers to use in preparation for doing builds for new customers. Please ensure as best as possible each of these items has been addressed prior to the dev team being asked to do a build.
Workflows
Provide a list of the workflows required for the customer from the following list: List of Workflows
External Documents and Reports
Ensure all required external documents are installed in the database to be built against. This includes the the following in-house US Workflows Reports:
| QestID | Name |
|---|---|
| 19900 | Daily Field Report |
| 19901 | Report for Mechanical Testing of Steel Products [ASTM A 370] |
| 19902 | Report for Mechanical Testing of Steel Products [Caltrans CT670 Splice] |
| 19903 | Report for Mechanical Testing of Steel Products [Caltrans CT670 Hoops] |
| 19904 | Report for Batch Plant Inspection Checklist |